The Rolling Stock Group have been making good progress with Coach 7 (the tram trailer) and the regauged chassis for the SR covered van. The picture shows us painting the coach roof, after the rubbing down and priming had been done. The centre section is canvas – in very good condition, luckily. The two sections of the van chassis have been welded together, to provide a higher and wider chassis than the original. Brake gear is now completed – see picture.
Coach and wagon progress