The latest picture of the “Blyth” locomotive boiler with ready for its 58 tubes in the Darlington workshop of North Bay Railway Engineering Services. I confess I find it rather emotional watching this machine come back to life. Many thanks to David Humphreys and his team.
A lot is going on at Blyth Road currently as Steamworks prepares to open for its first Open Day of the year on Saturday 20th April at 10.30am. It is open every Saturday and Bank Holiday until the end of August.
John Bennett 17.4.19
17th April, 2019